Bought Produced in the chain Final productEdge labels: quantity each job consumes.
Slot allocation
Optimal slots: 1
line sized so every job fits one 7-day cycle; the
figures on this page are per steady cycle.
1 line · 5 slots · 97.4% utilisation
Initial investment 1.13B
Slots per reaction
Reaction
Slots
Runs / slot
Duration / slot
First cycle
Pure Strong Crash Booster
1
122
6d 22h 53m
3
Pure Standard Frentix Booster
1
120
6d 20h 9m
2
Pure Improved Crash Booster
1
120
6d 20h 9m
2
Pure Standard Blue Pill Booster
1
118
6d 17h 25m
1
Pure Standard Crash Booster
1
118
6d 17h 25m
1
Cycle 1: 2 slots (intermediates)
· Cycle 2: 4 slots (intermediates)
· Cycle 3+: 5 slots (steady state)
Start-up
One-time cycles before cycle 3, from which every
cycle runs the production steps below.
Cycle 1, start-up
Runs Pure Standard Blue Pill Booster(1 × 118 runs), Pure Standard Crash Booster(1 × 118 runs).
Buy for cycle 1
Item
Quantity
Unit price
Total
Broker fee
Nitrogen Fuel Block
1,152
16.54K
19.05M
285.81K
Water
4,608
446
2.06M
30.84K
Amber Cytoserocin
2,304
45.51K
104.86M
1.57M
Golden Cytoserocin
2,304
28.11K
64.77M
971.48K
Total
190.73M
2.86M
Multibuy list (4 items)
Job cost 36.25M · with purchases 229.85M
Cycle 2, start-up
Runs Pure Standard Frentix Booster(1 × 120 runs), Pure Improved Crash Booster(1 × 120 runs), Pure Standard Blue Pill Booster(1 × 118 runs), Pure Standard Crash Booster(1 × 118 runs).
Buy for cycle 2
Item
Quantity
Unit price
Total
Broker fee
Nitrogen Fuel Block
1,738
16.54K
28.75M
431.20K
Helium Fuel Block
586
17.64K
10.34M
155.06K
Water
6,951
446
3.10M
46.52K
Lime Cytoserocin
2,343
42.62K
99.86M
1.50M
Spirits
2,343
331
775.53K
11.63K
Amber Cytoserocin
2,304
45.51K
104.86M
1.57M
Golden Cytoserocin
2,304
28.11K
64.77M
971.48K
Total
312.44M
4.69M
Multibuy list (7 items)
Job cost 104.64M · with purchases 421.77M
Production steps
Every cycle from cycle 3: 3 steps, every job in its own slots, side by side; a step's output feeds the next step in the following cycle.