Crystalline Carbonide Reaction

Crystalline Carbonide Reaction Formula · Composite reactor · prices as of 2026-10-08 19:31 UTC

Profit / slot / day
1.13M
Profit
31.78M
Margin
16.4%
ROI
20.9%
Total cost
152.26M
Output value
193.93M
Runs
244
Time per run
1h 22m 5s
Job duration
6d 22h 53m
Slots
4

Material flow

Material flow for Crystalline Carbonide5 bought materials feed 3 reaction jobs ending in Crystalline Carbonide.586 Helium Fuel Block → Crystallite Alloy58611,712 Cobalt → Crystallite Alloy11,71211,712 Cadmium → Crystallite Alloy11,712586 Helium Fuel Block → Carbon Polymers58611,712 Hydrocarbons → Carbon Polymers11,71211,712 Silicates → Carbon Polymers11,7121,192 Helium Fuel Block → Crystalline Carbonide1,19223,816 Crystallite Alloy → Crystalline Carbonide23,81623,816 Carbon Polymers → Crystalline Carbonide23,816Helium Fuel Block: 2,364 boughtHelium Fuel Block2,364 boughtCobalt: 11,712 boughtCobalt11,712 boughtCadmium: 11,712 boughtCadmium11,712 boughtHydrocarbons: 11,712 boughtHydrocarbons11,712 boughtSilicates: 11,712 boughtSilicates11,712 boughtCrystallite Alloy: 24,000 · 120 runs (produced in the chain)Crystallite Alloy24,000 · 120 runsCarbon Polymers: 24,000 · 120 runs (produced in the chain)Carbon Polymers24,000 · 120 runsCrystalline Carbonide: 2,440,000 · 244 runs in 2 slots (final product)Crystalline Carbonide2,440,000 · 244 runs in 2 slots
Bought Produced in the chain Final product Edge labels: quantity each job consumes.

Slot allocation

Optimal slots: 2 parallel lines sized so every job fits one 7-day cycle; the figures on this page are per steady cycle.

2 lines · 4 slots · 98.5% utilisation

Initial investment 264.04M

Slots per reaction
ReactionSlotsRuns / slotDuration / slotFirst cycle
Crystalline Carbonide21226d 22h 53m2
Carbon Polymers11206d 20h 9m1
Crystallite Alloy11206d 20h 9m1
  1. Cycle 1: 2 slots (intermediates)
  2. · Cycle 2+: 4 slots (steady state)

Start-up

One-time cycle before cycle 2, from which every cycle runs the production steps below.

Cycle 1, start-up

Runs Carbon Polymers (1 × 120 runs), Crystallite Alloy (1 × 120 runs).

Buy for cycle 1

ItemQuantityUnit priceTotalBroker fee
Helium Fuel Block 1,17217.64K20.67M310.11K
Hydrocarbons 11,7124315.05M75.70K
Silicates 11,7123594.21M63.09K
Cobalt 11,7125656.61M99.17K
Cadmium 11,7125.50K64.37M965.54K
Total100.91M1.51M
Multibuy list (5 items)

Job cost 9.36M · with purchases 111.78M

Production steps

Every cycle from cycle 2: 2 steps, every job in its own slots, side by side; a step's output feeds the next step in the following cycle.

Multibuy list (5 items)

Step 1 of 2 · 2 intermediates in parallel

Reaction jobs of step 1
JobSlotsRuns / slotPer runDuration / slotProducedUsedSurplusJob cost
Crystallite Alloy11201h 22m 5s6d 20h 9m24,00023,8161847.76M
Carbon Polymers11201h 22m 5s6d 20h 9m24,00023,8161841.60M

Buy for step 1

ItemQuantityUnit priceTotalBroker fee
Helium Fuel Block 1,17217.64K20.67M310.11K
Cobalt 11,7125656.61M99.17K
Cadmium 11,7125.50K64.37M965.54K
Hydrocarbons 11,7124315.05M75.70K
Silicates 11,7123594.21M63.09K
Total100.91M1.51M

Job cost 9.36M = system 6.27M (10.14%) + facility tax 617.91K (1.00%) + SCC 2.47M (4.00%)

Step subtotal 111.78M

Step 2 of 2 · final product

Reaction jobs of step 2
JobSlotsRuns / slotPer runDuration / slotProducedUsedJob cost
Crystalline Carbonide21221h 22m 5s6d 22h 53m2,440,0002,440,00019.15M

Uses 23,816 Crystallite Alloy from step 1, 23,816 Carbon Polymers from step 1.

Buy for step 2

ItemQuantityUnit priceTotalBroker fee
Helium Fuel Block 1,19217.64K21.03M315.40K
Total21.03M315.40K

Job cost 19.15M = system 12.82M (10.14%) + facility tax 1.26M (1.00%) + SCC 5.06M (4.00%)

Step subtotal 40.49M

Summary

Costs

Purchases
121.93M
Broker fees
1.83M
Job cost
28.50M
Total cost
152.26M

Sale

Output value
193.93M
Sales tax & broker fees
9.89M
Profit
31.78M

Slot time

Jobs (2 steps)
4
Slot time (4 slots × 7 d)
28d
Profit / run (244 runs)
130.23K
Profit / slot / day
1.13M

Outputs

ItemQuantityUnit priceTotalTax & feesVolume m³
Crystalline Carbonide 2,440,00079.48193.93M9.89M24,400.00
Total193.93M9.89M24,400.00

Surplus intermediates (not counted as profit)

ItemQuantityUnit priceTotalVolume m³
Crystallite Alloy 1844.55K837.38K36.80
Carbon Polymers 1841.94K357.70K36.80
Total1.20M73.60

Price timing

Default 14 days (chain depth × cycle length). Input prices as of 2026-09-24.
Approximate (daily averages)
Profit, inputs bought 14 days ago
23.93M
Profit at today's prices
31.78M
Difference
-7.85M

Price and volume history

Profit / slot / day
Output value
Input cost
Traded per day, The Forge

90 of 90 days (≈ in the table) use the region's average daily trade price where no hub prices were collected, for buying and selling alike.

Data table (90 days)
DateProfit / slot / dayOutput valueInput costTraded
2026-07-10 ≈1.58M211.30M125.89M32,424,701
2026-07-11 ≈1.39M211.94M131.77M44,022,611
2026-07-12 ≈1.26M211.96M135.21M68,272,522
2026-07-13 ≈869.78K211.94M146.08M24,673,960
2026-07-14 ≈1.21M211.89M136.52M22,346,253
2026-07-15 ≈1.04M211.77M141.19M50,297,602
2026-07-16 ≈1.09M211.84M139.78M23,863,231
2026-07-17 ≈653.99K199.47M140.38M46,340,559
2026-07-18 ≈1.10M212.21M140.07M34,754,030
2026-07-19 ≈967.30K212.26M143.69M42,102,419
2026-07-20 ≈956.05K210.96M142.79M38,345,776
2026-07-21 ≈1.05M210.57M139.82M18,914,809
2026-07-22 ≈912.24K209.69M142.81M31,350,940
2026-07-23 ≈927.76K209.50M142.20M6,520,542
2026-07-24 ≈698.59K200.01M139.65M53,980,100
2026-07-25 ≈1.10M209.30M137.21M15,982,759
2026-07-26 ≈951.87K209.23M141.29M36,463,125
2026-07-27 ≈784.04K200.01M137.29M45,118,875
2026-07-28 ≈1.22M207.23M131.94M47,011,356
2026-07-29 ≈946.99K207.18M139.51M24,811,678
2026-07-30 ≈267.86K183.49M136.09M72,565,690
2026-07-31 ≈1.28M205.91M129.02M30,824,163
2026-08-01 ≈675.68K192.25M133.03M26,744,372
2026-08-02 ≈547.86K192.03M136.35M32,450,181
2026-08-03 ≈615.78K191.78M134.25M39,711,126
2026-08-04 ≈787.52K191.49M129.24M30,394,987
2026-08-05 ≈506.16K183.00M129.06M55,743,109
2026-08-06 ≈275.30K178.80M131.50M14,966,261
2026-08-07 ≈261.04K175.53M128.84M11,788,282
2026-08-08 ≈222.93K174.97M129.37M71,391,351
2026-08-09 ≈270.85K174.87M127.95M39,621,692
2026-08-10 ≈407.72K174.92M124.22M54,003,692
2026-08-11 ≈154.27K174.80M131.10M22,661,783
2026-08-12 ≈142.88K174.90M131.51M96,762,566
2026-08-13 ≈336.64K173.65M125.00M18,159,906
2026-08-14 ≈1.13M197.64M125.42M16,162,187
2026-08-15 ≈1.04M197.40M127.74M42,287,181
2026-08-16 ≈821.84K197.30M133.72M29,737,761
2026-08-17 ≈618.27K188.76M131.35M45,830,067
2026-08-18 ≈964.99K196.76M129.27M28,929,268
2026-08-19 ≈838.76K195.00M131.11M27,420,662
2026-08-20 ≈597.33K190.32M133.39M40,422,735
2026-08-21 ≈358.58K185.71M135.66M59,644,352
2026-08-22 ≈936.88K190.32M124.02M52,855,449
2026-08-23 ≈776.38K187.86M126.14M32,554,022
2026-08-24 ≈817.37K187.88M125.04M56,529,476
2026-08-25 ≈950.47K192.32M125.52M45,778,962
2026-08-26 ≈1.16M192.32M119.65M23,012,377
2026-08-27 ≈1.18M192.54M119.29M13,120,963
2026-08-28 ≈833.87K192.59M128.98M28,697,735
2026-08-29 ≈942.01K190.61M124.15M31,860,452
2026-08-30 ≈1.01M192.54M124.09M39,300,855
2026-08-31 ≈912.32K195.20M129.26M54,168,244
2026-09-01 ≈928.71K196.81M130.31M47,529,509
2026-09-02 ≈1.18M196.81M123.26M18,463,882
2026-09-03 ≈947.49K196.57M129.57M66,275,246
2026-09-04 ≈800.92K190.32M127.77M70,135,890
2026-09-05 ≈898.68K196.37M130.73M15,898,850
2026-09-06 ≈1.11M196.71M125.18M37,878,496
2026-09-07 ≈992.42K196.66M128.42M42,714,140
2026-09-08 ≈900.33K195.08M129.48M27,268,934
2026-09-09 ≈944.72K194.91M128.09M12,759,613
2026-09-10 ≈787.52K194.88M132.41M52,034,554
2026-09-11 ≈871.91K194.83M130.03M28,763,607
2026-09-12 ≈662.88K194.22M135.23M93,619,486
2026-09-13 ≈871.81K194.59M129.81M69,984,793
2026-09-14 ≈975.33K196.69M128.91M31,870,879
2026-09-15 ≈429.59K186.49M134.43M44,401,684
2026-09-16 ≈946.74K197.32M130.30M18,993,016
2026-09-17 ≈1.12M202.50M130.28M25,628,015
2026-09-18 ≈1.17M202.47M128.87M12,028,059
2026-09-19 ≈1.19M202.50M128.54M43,788,433
2026-09-20 ≈1.17M202.50M128.92M94,294,583
2026-09-21 ≈1.25M202.47M126.65M30,468,523
2026-09-22 ≈999.83K196.44M128.01M44,859,888
2026-09-23 ≈1.14M202.28M129.46M37,336,904
2026-09-24 ≈1.14M202.20M129.66M25,232,836
2026-09-25 ≈1.14M201.76M129.15M43,699,120
2026-09-26 ≈1.11M201.79M129.88M24,970,343
2026-09-27 ≈1.12M201.30M129.30M26,952,468
2026-09-28 ≈1.29M201.25M124.47M60,160,070
2026-09-29 ≈1.08M195.66M125.20M41,523,567
2026-09-30 ≈1.21M201.23M126.57M127,731,563
2026-10-01 ≈1.17M199.88M126.58M32,866,384
2026-10-02 ≈1.16M198.23M125.33M54,920,964
2026-10-03 ≈1.12M198.47M126.51M23,393,705
2026-10-04 ≈1.06M198.30M127.96M81,330,288
2026-10-05 ≈1.04M198.30M128.76M14,587,368
2026-10-06 ≈1.17M198.25M125.06M13,648,566
2026-10-07 ≈1.03M194.03M124.86M12,218,990

Support the site: use code oxed on the EVE Online Store

More EVE tools: D-Scan Space (d-scan and local scan analyzer) Coalition Market Data (market data and price history API)

EVE Online Partner

EVE Online® and Fenris Creations™ and all related logos and other elements are trademarks of Fenris Creations. © 2014 Fenris Creations. All rights reserved. "EVE", "EVE Online", "Fenris Creations", and all related logos and images are trademarks or registered trademarks of Fenris Creations. Fenris Creations is in no way responsible for the content on or functioning of this website, nor can it be liable for any damage arising from the use of this website. © 2026 EVE Reactions Calculator