Home / Biochemical / Ultradian-Cycling Neurolink Stabilizer This formula allows a limited number of runs per job (shown under Runs), so the job ends before your cycle does. EVE does not allow more runs in one job.
Profit / slot / day 20.17M
Profit 114.98M
Margin 25.5%
ROI 36.7%
Total cost 313.31M
Output value 451.30M
Runs 100 max
Time per run 1h 22m 5s
Job duration 5d 16h 48m Material flow Material flow for Ultradian-Cycling Neurolink Stabilizer 4 bought materials feed 1 reaction jobs ending in Ultradian-Cycling Neurolink Stabilizer. 488 Helium Fuel Block → Ultradian-Cycling Neurolink Stabilizer 488 976 Malachite Cytoserocin → Ultradian-Cycling Neurolink Stabilizer 976 976 Lime Cytoserocin → Ultradian-Cycling Neurolink Stabilizer 976 100 LM-Composite Molecular Condenser → Ultradian-Cycling Neurolink Stabilizer 100 Helium Fuel Block: 488 bought Helium Fuel Block 488 bought Malachite Cytoserocin: 976 bought Malachite Cytoserocin 976 bought Lime Cytoserocin: 976 bought Lime Cytoserocin 976 bought LM-Composite Molecular Condenser: 100 bought LM-Composite Molecular Condenser 100 bought Ultradian-Cycling Neurolink Stabilizer: 1,000 · 100 runs (final product) Ultradian-Cycling Neurolink Stabilizer 1,000 · 100 runs Bought Final product Edge labels: quantity each job consumes. Production steps One reaction job; every input is bought.
Copy multibuy Multibuy list (4 items)
Step 1 · single reaction Reaction jobs of step 1 Job Runs Per run Duration Produced Used Job cost Ultradian-Cycling Neurolink Stabilizer 100 1h 22m 5s 5d 16h 48m 1,000 1,000 32.41M
Buy for step 1 Item Quantity Unit price Total Broker fee Helium Fuel Block 488 17.62K 8.60M 128.98K Malachite Cytoserocin 976 135.10K 131.86M 1.98M Lime Cytoserocin 976 42.61K 41.59M 623.81K LM-Composite Molecular Condenser 100 947.00K 94.70M 1.42M Total 276.74M 4.15M
Job cost 32.41M = system
21.72M (10.15%) + facility tax
2.14M (1.00%) + SCC
8.56M (4.00%)
Step subtotal 313.31M
Summary Costs
Purchases 276.74M
Broker fees 4.15M
Job cost 32.41M
Total cost 313.31M Sale
Output value 451.30M
Sales tax & broker fees 23.02M
Profit 114.98M Slot time
Jobs 1
Total slot time 5d 16h 48m
Profit / run (100 runs) 1.15M
Profit / slot / day 20.17M Outputs Item Quantity Unit price Total Tax & fees Volume m³ Ultradian-Cycling Neurolink Stabilizer 1,000 451.30K 451.30M 23.02M 10,000.00 Total 451.30M 23.02M 10,000.00
Price timing Default 7 days (chain depth × cycle length). Input prices as of 2026-10-01. Approximate (daily averages)
Profit, inputs bought 7 days ago 116.71M
Profit at today's prices 114.98M
Difference +1.73M Profit / slot / day
Output value
Input cost
Traded per day, The Forge
365 of 365 days (≈ in the table) use the region's average daily trade price where
no hub prices were collected, for buying and selling alike.
Data table (365 days) Date Profit / slot / day Output value Input cost Traded 2025-10-08 ≈ 2.67M 284.90M 219.46M 320 2025-10-09 ≈ 5.95M 284.70M 200.84M 1,115 2025-10-10 ≈ 4.96M 283.88M 205.65M 44 2025-10-11 ≈ 5.21M 283.40M 203.76M 541 2025-10-12 ≈ 5.43M 282.70M 201.91M 287 2025-10-13 ≈ 6.36M 282.70M 196.69M 482 2025-10-14 ≈ 4.25M 282.70M 208.52M 358 2025-10-15 ≈ 5.50M 282.60M 201.39M 107 2025-10-16 ≈ -11.78M 282.20M 298.08M 123 2025-10-17 ≈ -19.63M 130.10M 199.95M 475 2025-10-18 ≈ 8.25M 282.30M 185.65M 251 2025-10-19 ≈ 5.69M 282.30M 200.06M 167 2025-10-20 ≈ 5.96M 284.90M 200.96M 2,389 2025-10-21 ≈ 8.54M 290.30M 191.52M 16 2025-10-22 ≈ 7.10M 290.20M 199.53M 215 2025-10-23 ≈ 5.25M 279.43M 199.83M 75 2025-10-24 ≈ n/a 290.00M n/a 217 2025-10-25 ≈ 5.78M 280.00M 197.40M 460 2025-10-26 ≈ 7.80M 289.90M 195.30M 185 2025-10-27 ≈ 8.62M 289.40M 190.25M 1,101 2025-10-28 ≈ 8.22M 288.60M 191.76M 273 2025-10-29 ≈ 8.46M 288.40M 190.19M 1,113 2025-10-30 ≈ 8.82M 288.40M 188.16M 60 2025-10-31 ≈ n/a 288.30M n/a 115 2025-11-01 ≈ -6.34M 288.20M 273.12M 619 2025-11-02 ≈ 4.56M 288.20M 211.93M 920 2025-11-03 ≈ 12.67M 337.57M 212.54M 45 2025-11-04 ≈ 13.17M 337.50M 209.65M 325 2025-11-05 ≈ 14.29M 337.60M 203.46M 366 2025-11-06 ≈ 12.80M 337.60M 211.86M 1,036 2025-11-07 ≈ -9.57M 200.10M 208.89M 54 2025-11-08 ≈ 4.26M 284.75M 210.35M 82 2025-11-09 ≈ -14.05M 200.10M 234.07M 13 2025-11-10 ≈ 8.87M 336.00M 232.41M 385 2025-11-11 ≈ 2.85M 267.00M 201.67M 893 2025-11-12 ≈ -9.01M 200.00M 205.65M 1,950 2025-11-13 ≈ 1.60M 336.10M 273.35M 740 2025-11-14 ≈ 1.49M 336.10M 273.97M 525 2025-11-15 ≈ 1.48M 335.70M 273.60M 892 2025-11-16 ≈ 12.17M 336.10M 213.97M 295 2025-11-17 ≈ 1.94M 335.60M 270.96M 756 2025-11-18 ≈ 2.01M 335.60M 270.57M 180 2025-11-19 ≈ -32.63M 128.80M 271.72M 627 2025-11-20 ≈ 2.72M 335.80M 266.78M 2,979 2025-11-21 ≈ -17.48M 210.50M 263.02M 208 2025-11-22 ≈ 2.09M 335.10M 269.63M 183 2025-11-23 ≈ -5.99M 240.50M 226.54M 1,362 2025-11-24 ≈ 7.95M 332.80M 234.60M 526 2025-11-25 ≈ -12.80M 322.60M 341.57M 691 2025-11-26 ≈ -5.72M 333.90M 312.36M 133 2025-11-27 ≈ -2.78M 333.60M 295.59M 205 2025-11-28 ≈ 10.08M 333.20M 223.00M 400 2025-11-29 ≈ 9.48M 333.30M 226.46M 406 2025-11-30 ≈ 9.41M 334.60M 228.08M 1,408 2025-12-01 ≈ 4.73M 334.20M 253.96M 384 2025-12-02 ≈ -1.93M 334.00M 291.18M 224 2025-12-03 ≈ 750.15K 334.20M 276.32M 12 2025-12-04 ≈ -1.65M 333.10M 288.79M 858 2025-12-05 ≈ 8.35M 333.02M 232.55M 77 2025-12-06 ≈ 7.93M 333.00M 234.86M 303 2025-12-07 ≈ 1.92M 333.10M 268.70M 254 2025-12-08 ≈ 7.81M 334.10M 236.55M 244 2025-12-09 ≈ 1.98M 295.10M 232.87M 303 2025-12-10 ≈ -2.00M 295.20M 255.30M 597 2025-12-11 ≈ 674.82K 332.00M 274.69M 222 2025-12-12 ≈ 2.19M 324.38M 259.06M 66 2025-12-13 ≈ 5.62M 327.77M 242.94M 38 2025-12-14 ≈ 4.64M 327.80M 248.47M 824 2025-12-15 ≈ 689.94K 327.90M 270.77M 152 2025-12-16 ≈ 4.81M 327.60M 247.36M 115 2025-12-17 ≈ 2.53M 300.60M 234.94M 9,388 2025-12-18 ≈ -487.32K 315.00M 265.32M 1,991 2025-12-19 ≈ -100.26K 300.70M 249.78M 1,041 2025-12-20 ≈ 3.63M 325.60M 252.12M 2,652 2025-12-21 ≈ 2.63M 327.70M 259.70M 135 2025-12-22 ≈ 6.90M 327.70M 235.73M 717 2025-12-23 ≈ 3.67M 326.10M 252.36M 484 2025-12-24 ≈ 7.38M 326.10M 231.54M 330 2025-12-25 ≈ 10.34M 311.29M 201.07M 17 2025-12-26 ≈ 13.72M 326.00M 195.83M 131 2025-12-27 ≈ 14.35M 326.00M 192.26M 380 2025-12-28 ≈ 14.84M 327.80M 191.22M 688 2025-12-29 ≈ 13.72M 327.80M 197.49M 531 2025-12-30 ≈ 7.89M 327.90M 230.31M 387 2025-12-31 ≈ 8.79M 302.60M 201.61M 567 2026-01-01 ≈ 5.11M 310.00M 229.21M 303 2026-01-02 ≈ 5.39M 310.00M 227.61M 2,017 2026-01-03 ≈ 10.01M 327.70M 218.25M 200 2026-01-04 ≈ 7.44M 313.00M 218.92M 261 2026-01-05 ≈ 4.02M 305.00M 230.67M 1,131 2026-01-06 ≈ 4.81M 312.90M 233.63M 429 2026-01-07 ≈ 3.81M 312.80M 239.13M 178 2026-01-08 ≈ 8.52M 312.80M 212.70M 32 2026-01-09 ≈ 8.67M 312.80M 211.85M 556 2026-01-10 ≈ 11.77M 327.20M 207.92M 272 2026-01-11 ≈ 6.98M 327.35M 234.90M 200 2026-01-12 ≈ 5.10M 327.30M 245.42M 3,272 2026-01-13 ≈ 6.80M 327.10M 235.73M 245 2026-01-14 ≈ n/a 300.80M n/a 162 2026-01-15 ≈ 1.02M 326.80M 267.91M 118 2026-01-16 ≈ 4.08M 326.90M 250.79M 255 2026-01-17 ≈ 8.92M 327.10M 223.82M 826 2026-01-18 ≈ 8.66M 325.80M 224.05M 179 2026-01-19 ≈ 2.27M 325.50M 259.63M 142 2026-01-20 ≈ -851.41K 325.50M 277.18M 205 2026-01-21 ≈ 7.92M 325.80M 228.18M 238 2026-01-22 ≈ -280.13K 325.70M 274.16M 396 2026-01-23 ≈ -2.96M 310.70M 275.19M 837 2026-01-24 ≈ -3.09M 310.70M 275.93M 724 2026-01-25 ≈ -5.19M 294.00M 272.09M 1,012 2026-01-26 ≈ 3.26M 326.40M 254.91M 320 2026-01-27 ≈ -975.09K 326.40M 278.72M 170 2026-01-28 ≈ -2.43M 326.30M 286.82M 113 2026-01-29 ≈ 4.26M 326.20M 249.15M 175 2026-01-30 ≈ 17.90K 326.20M 272.95M 380 2026-01-31 ≈ -2.25M 326.10M 285.61M 126 2026-02-01 ≈ 1.15M 326.10M 266.51M 783 2026-02-02 ≈ 798.01K 326.30M 268.67M 162 2026-02-03 ≈ 3.50M 326.20M 253.40M 1,465 2026-02-04 ≈ 6.44M 327.50M 238.08M 2,723 2026-02-05 ≈ 6.71M 327.90M 236.99M 325 2026-02-06 ≈ 629.49K 317.83M 261.70M 72 2026-02-07 ≈ 11.95M 377.70M 254.09M 1,714 2026-02-08 ≈ 12.01M 374.12M 250.40M 98 2026-02-09 ≈ 14.06M 388.00M 251.87M 382 2026-02-10 ≈ 14.18M 388.00M 251.18M 16 2026-02-11 ≈ 14.17M 388.00M 251.24M 80 2026-02-12 ≈ 13.84M 385.83M 251.09M 87 2026-02-13 ≈ 14.33M 387.80M 250.17M 474 2026-02-14 ≈ 13.93M 375.00M 240.46M 541 2026-02-15 ≈ 14.67M 379.90M 240.89M 36 2026-02-16 ≈ 17.28M 379.90M 226.20M 209 2026-02-17 ≈ 17.32M 379.90M 226.02M 57 2026-02-18 ≈ 16.78M 379.80M 228.91M 209 2026-02-19 ≈ n/a n/a 243.85M n/a 2026-02-20 ≈ 7.40M 337.00M 241.60M 24 2026-02-21 ≈ 17.87M 399.71M 241.41M 81 2026-02-22 ≈ 18.99M 400.00M 235.40M 347 2026-02-23 ≈ 6.56M 337.70M 246.98M 15 2026-02-24 ≈ n/a n/a 245.18M n/a 2026-02-25 ≈ 21.88M 424.00M 241.63M 453 2026-02-26 ≈ 14.56M 394.00M 254.66M 1,279 2026-02-27 ≈ 14.64M 394.00M 254.20M 972 2026-02-28 ≈ 14.12M 394.00M 257.14M 458 2026-03-01 ≈ 13.96M 393.90M 257.93M 137 2026-03-02 ≈ 9.01M 344.48M 239.53M 10 2026-03-03 ≈ 10.02M 370.00M 257.74M 296 2026-03-04 ≈ 12.86M 374.40M 245.88M 298 2026-03-05 ≈ 12.08M 374.40M 250.30M 408 2026-03-06 ≈ 10.39M 374.30M 259.66M 100 2026-03-07 ≈ 7.10M 374.40M 278.24M 285 2026-03-08 ≈ 3.58M 350.00M 275.18M 371 2026-03-09 ≈ 11.38M 374.40M 254.24M 275 2026-03-10 ≈ 4.60M 325.10M 246.17M 499 2026-03-11 ≈ 8.90M 374.40M 268.15M 128 2026-03-12 ≈ 13.94M 374.40M 239.86M 475 2026-03-13 ≈ 12.47M 374.40M 248.07M 400 2026-03-14 ≈ 13.83M 374.40M 240.44M 692 2026-03-15 ≈ 18.08M 374.40M 216.57M 483 2026-03-16 ≈ 11.34M 374.30M 254.35M 431 2026-03-17 ≈ 10.80M 374.40M 257.49M 368 2026-03-18 ≈ 8.69M 374.30M 269.24M 598 2026-03-19 ≈ 5.29M 325.10M 242.32M 543 2026-03-20 ≈ 12.11M 374.10M 249.81M 920 2026-03-21 ≈ 11.08M 374.10M 255.63M 665 2026-03-22 ≈ 13.84M 373.80M 239.85M 811 2026-03-23 ≈ 13.82M 374.30M 240.40M 423 2026-03-24 ≈ 13.29M 374.30M 243.38M 117 2026-03-25 ≈ 11.43M 374.40M 253.96M 220 2026-03-26 ≈ 11.33M 374.30M 254.39M 773 2026-03-27 ≈ 12.38M 374.40M 248.57M 558 2026-03-28 ≈ -9.65M 250.00M 256.02M 679 2026-03-29 ≈ 11.49M 373.90M 253.13M 204 2026-03-30 ≈ 11.00M 373.20M 255.20M 51 2026-03-31 ≈ 12.09M 373.20M 249.11M 57 2026-04-01 ≈ 11.24M 373.18M 253.87M 93 2026-04-02 ≈ -7.27M 251.51M 244.07M 100 2026-04-03 ≈ 13.22M 372.50M 242.08M 305 2026-04-04 ≈ 10.94M 371.70M 254.19M 341 2026-04-05 ≈ 11.53M 371.20M 250.38M 639 2026-04-06 ≈ 12.45M 370.80M 244.84M 894 2026-04-07 ≈ 11.83M 370.06M 247.64M 77 2026-04-08 ≈ 11.31M 371.00M 251.44M 86 2026-04-09 ≈ 11.30M 371.00M 251.47M 215 2026-04-10 ≈ 11.17M 371.60M 252.78M 796 2026-04-11 ≈ -8.91M 251.60M 253.34M 349 2026-04-12 ≈ 14.33M 371.70M 235.13M 326 2026-04-13 ≈ 12.65M 374.30M 247.02M 533 2026-04-14 ≈ 12.58M 374.40M 247.46M 533 2026-04-15 ≈ 11.48M 374.40M 253.64M 375 2026-04-16 ≈ 12.93M 374.30M 245.43M 441 2026-04-17 ≈ 14.51M 374.30M 236.57M 400 2026-04-18 ≈ 12.32M 374.40M 248.92M 87 2026-04-19 ≈ 14.30M 374.40M 237.83M 282 2026-04-20 ≈ 15.18M 374.40M 232.85M 252 2026-04-21 ≈ 13.90M 374.30M 239.97M 15 2026-04-22 ≈ 12.83M 373.82M 245.54M 97 2026-04-23 ≈ 12.89M 373.00M 244.43M 157 2026-04-24 ≈ 18.05M 371.50M 214.06M 152 2026-04-25 ≈ 15.47M 370.00M 227.14M 3,070 2026-04-26 ≈ -4.03M 251.60M 225.95M 1,693 2026-04-27 ≈ -45.76M 1.24M 226.22M 1,483 2026-04-28 ≈ 12.88M 368.90M 240.65M 788 2026-04-29 ≈ 13.49M 368.60M 236.96M 705 2026-04-30 ≈ 13.23M 360.00M 230.37M 29 2026-05-01 ≈ 12.05M 359.90M 236.88M 131 2026-05-02 ≈ 9.55M 344.00M 236.07M 90 2026-05-03 ≈ 7.91M 339.80M 241.38M 244 2026-05-04 ≈ 7.70M 330.00M 233.36M 490 2026-05-05 ≈ 4.89M 324.41M 243.89M 90 2026-05-06 ≈ 3.27M 299.90M 230.08M 48 2026-05-07 ≈ 3.55M 299.00M 227.71M 465 2026-05-08 ≈ -3.42M 290.00M 258.44M 161 2026-05-09 ≈ -4.22M 289.00M 261.98M 2,029 2026-05-10 ≈ -3.86M 277.45M 249.12M 282 2026-05-11 ≈ -6.16M 270.00M 255.08M 185 2026-05-12 ≈ -19.78M 200.00M 266.17M 1,058 2026-05-13 ≈ -16.63M 200.00M 248.42M 67 2026-05-14 ≈ -17.90M 199.90M 255.46M 672 2026-05-15 ≈ -15.96M 199.60M 244.30M 155 2026-05-16 ≈ -15.86M 199.60M 243.74M 1,150 2026-05-17 ≈ -20.03M 200.00M 267.52M 356 2026-05-18 ≈ -17.90M 200.00M 255.58M 224 2026-05-19 ≈ -18.11M 200.00M 256.74M 726 2026-05-20 ≈ -17.75M 200.00M 254.74M 132 2026-05-21 ≈ -22.28M 200.00M 280.15M 265 2026-05-22 ≈ -15.11M 200.00M 239.90M 169 2026-05-23 ≈ -18.67M 200.00M 259.91M 125 2026-05-24 ≈ -20.15M 200.00M 268.24M 448 2026-05-25 ≈ -21.51M 200.00M 275.87M 639 2026-05-26 ≈ -18.47M 200.00M 258.80M 170 2026-05-27 ≈ -12.63M 249.80M 272.52M 8,140 2026-05-28 ≈ -5.54M 268.80M 250.49M 329 2026-05-29 ≈ -7.95M 268.80M 264.02M 1,062 2026-05-30 ≈ -11.47M 260.00M 275.58M 61 2026-05-31 ≈ -10.70M 260.00M 271.23M 1,384 2026-06-01 ≈ -10.14M 268.80M 276.34M 264 2026-06-02 ≈ -10.16M 268.80M 276.45M 920 2026-06-03 ≈ -10.11M 268.80M 276.18M 180 2026-06-04 ≈ -10.11M 268.80M 276.14M 518 2026-06-05 ≈ -6.32M 268.80M 254.88M 223 2026-06-06 ≈ -6.69M 268.80M 256.97M 255 2026-06-07 ≈ -7.40M 268.80M 260.93M 2,519 2026-06-08 ≈ -7.59M 268.80M 262.01M 126 2026-06-09 ≈ -9.34M 269.00M 272.01M 125 2026-06-10 ≈ -3.14M 305.24M 271.11M 96 2026-06-11 ≈ 74.79K 328.40M 274.69M 535 2026-06-12 ≈ 89.86K 328.40M 274.61M 162 2026-06-13 ≈ 112.11K 328.30M 274.39M 37 2026-06-14 ≈ -22.89M 200.00M 283.58M 1,703 2026-06-15 ≈ -3.20M 328.10M 292.81M 324 2026-06-16 ≈ 1.47M 328.00M 266.47M 401 2026-06-17 ≈ 699.93K 327.80M 270.62M 102 2026-06-18 ≈ -16.12M 250.80M 293.08M 295 2026-06-19 ≈ -962.37K 327.50M 279.67M 235 2026-06-20 ≈ -3.40M 327.40M 293.26M 15 2026-06-21 ≈ -889.96K 327.20M 278.99M 113 2026-06-22 ≈ -330.74K 327.00M 275.66M 138 2026-06-23 ≈ 1.14M 326.93M 267.33M 40 2026-06-24 ≈ 49.10K 326.80M 273.34M 770 2026-06-25 ≈ -1.02M 326.90M 279.46M 585 2026-06-26 ≈ -1.07M 326.80M 279.64M 159 2026-06-27 ≈ 947.43K 326.80M 268.30M 487 2026-06-28 ≈ 194.98K 326.80M 272.52M 195 2026-06-29 ≈ 686.54K 326.80M 269.76M 301 2026-06-30 ≈ 91.62K 326.80M 273.10M 239 2026-07-01 ≈ 2.39M 326.80M 260.18M 171 2026-07-02 ≈ 824.86K 326.80M 268.98M 459 2026-07-03 ≈ 1.30M 326.78M 266.30M 86 2026-07-04 ≈ 1.52M 326.40M 264.73M 101 2026-07-05 ≈ 358.12K 326.40M 271.23M 438 2026-07-06 ≈ -7.57M 292.83M 284.37M 60 2026-07-07 ≈ 749.45K 326.20M 268.85M 1,140 2026-07-08 ≈ 3.16M 324.02M 253.25M 59 2026-07-09 ≈ -1.44M 326.10M 281.05M 500 2026-07-10 ≈ -1.32M 326.10M 280.36M 80 2026-07-11 ≈ -1.90M 326.20M 283.70M 327 2026-07-12 ≈ 913.72K 325.90M 267.64M 56 2026-07-13 ≈ -4.59M 325.90M 298.53M 597 2026-07-14 ≈ -2.34M 326.00M 286.03M 1,200 2026-07-15 ≈ 2.46M 325.80M 258.88M 122 2026-07-16 ≈ -4.36M 325.80M 297.16M 402 2026-07-17 ≈ -11.28M 265.10M 279.29M 307 2026-07-18 ≈ -5.49M 318.80M 296.94M 351 2026-07-19 ≈ -833.31K 318.50M 270.54M 577 2026-07-20 ≈ -16.01M 318.50M 355.74M 205 2026-07-21 ≈ -2.00M 318.00M 276.63M 124 2026-07-22 ≈ -19.51M 317.90M 374.83M 456 2026-07-23 ≈ -7.84M 318.20M 309.62M 638 2026-07-24 ≈ -27.44M 318.20M 419.67M 57 2026-07-25 ≈ -11.23M 318.20M 328.64M 719 2026-07-26 ≈ -22.82M 318.10M 393.64M 125 2026-07-27 ≈ -14.03M 318.10M 344.24M 204 2026-07-28 ≈ -14.34M 318.00M 345.90M 106 2026-07-29 ≈ -12.94M 317.90M 337.97M 804 2026-07-30 ≈ -14.78M 317.90M 348.30M 112 2026-07-31 ≈ -17.13M 317.80M 361.39M 1,493 2026-08-01 ≈ -7.62M 318.10M 308.29M 345 2026-08-02 ≈ -8.01M 318.10M 310.46M 240 2026-08-03 ≈ -12.45M 318.30M 335.60M 384 2026-08-04 ≈ -9.49M 318.30M 318.93M 11 2026-08-05 ≈ -5.18M 318.30M 294.77M 166 2026-08-06 ≈ -5.30M 318.30M 295.43M 4,026 2026-08-07 ≈ n/a n/a 303.35M n/a 2026-08-08 ≈ -5.59M 325.10M 303.43M 90 2026-08-09 ≈ -1.27M 350.00M 302.45M 191 2026-08-10 ≈ -9.15M 322.00M 320.50M 1 2026-08-11 ≈ 63.38M 747.41M 310.95M 51 2026-08-12 ≈ 12.37M 440.00M 310.00M 64 2026-08-13 ≈ 12.20M 440.00M 310.92M 30 2026-08-14 ≈ 56.74M 694.55M 298.80M 11 2026-08-15 ≈ -31.01M 177.70M 308.34M 20 2026-08-16 ≈ n/a n/a 305.17M n/a 2026-08-17 ≈ 96.58M 930.00M 295.20M 184 2026-08-18 ≈ -2.95M 327.30M 290.67M 4 2026-08-19 ≈ 97.91M 929.60M 287.39M 237 2026-08-20 ≈ 79.75M 829.28M 295.56M 54 2026-08-21 ≈ 97.10M 929.27M 291.63M 87 2026-08-22 ≈ 96.80M 929.20M 293.24M 71 2026-08-23 ≈ 97.23M 929.20M 290.84M 425 2026-08-24 ≈ 90.98M 899.90M 298.55M 115 2026-08-25 ≈ 87.98M 890.00M 306.10M 442 2026-08-26 ≈ 24.52M 496.70M 294.79M 14 2026-08-27 ≈ 25.99M 496.40M 286.21M 180 2026-08-28 ≈ 26.34M 496.30M 284.15M 223 2026-08-29 ≈ 26.17M 496.30M 285.13M 28 2026-08-30 ≈ 31.32M 464.76M 226.69M 81 2026-08-31 ≈ -1.20M 339.70M 292.44M 1,058 2026-09-01 ≈ 16.20M 439.91M 288.42M 57 2026-09-02 ≈ 8.89M 389.60M 282.40M 180 2026-09-03 ≈ 11.35M 388.70M 267.76M 50 2026-09-04 ≈ 16.58M 389.30M 238.93M 122 2026-09-05 ≈ 9.84M 390.00M 277.46M 357 2026-09-06 ≈ 14.75M 390.00M 249.87M 418 2026-09-07 ≈ 15.14M 389.00M 246.78M 200 2026-09-08 ≈ 12.21M 388.00M 262.27M 2,880 2026-09-09 ≈ 7.71M 345.90M 248.15M 123 2026-09-10 ≈ 11.61M 389.40M 266.96M 787 2026-09-11 ≈ n/a n/a 261.36M n/a 2026-09-12 ≈ 13.37M 389.80M 257.44M 164 2026-09-13 ≈ 9.33M 379.90M 270.89M 9 2026-09-14 ≈ 10.95M 380.00M 261.85M 1,475 2026-09-15 ≈ 12.96M 390.00M 259.90M 413 2026-09-16 ≈ 26.86M 457.70M 245.14M 57 2026-09-17 ≈ 24.58M 457.69M 257.95M 46 2026-09-18 ≈ 27.07M 457.70M 244.01M 15 2026-09-19 ≈ n/a 458.10M n/a 208 2026-09-20 ≈ 27.01M 458.00M 244.61M 154 2026-09-21 ≈ 29.33M 455.00M 228.76M 314 2026-09-22 ≈ 23.05M 454.80M 263.83M 233 2026-09-23 ≈ 19.63M 454.50M 282.78M 5 2026-09-24 ≈ 25.82M 454.40M 247.91M 596 2026-09-25 ≈ 23.78M 454.20M 259.18M 11 2026-09-26 ≈ 8.37M 353.20M 251.30M 1,029 2026-09-27 ≈ 24.03M 451.90M 255.64M 108 2026-09-28 ≈ 20.40M 451.90M 276.02M 214 2026-09-29 ≈ 22.39M 451.40M 264.40M 416 2026-09-30 ≈ 23.04M 447.80M 257.37M 320 2026-10-01 ≈ 13.61M 410.06M 275.04M 24 2026-10-02 ≈ 4.65M 415.00M 329.95M 259 2026-10-03 ≈ 11.22M 408.26M 286.80M 70 2026-10-04 ≈ n/a 404.90M n/a 625 2026-10-05 ≈ -24.85K 358.60M 303.49M 500 2026-10-06 ≈ 6.53M 419.60M 323.70M 2,154 2026-10-07 ≈ 18.14M 451.50M 288.32M 113