- Profit / slot / day
- 6.85M
- Profit
- 47.61M
- Margin
- 5.4%
- ROI
- 6.1%
- Total cost
- 783.58M
- Output value
- 875.86M
- Runs
- 122
- Time per run
- 1h 22m 5s
- Job duration
- 6d 22h 53m
Material flow
Bought Final product Edge labels: quantity each job consumes. Production steps
One reaction job; every input is bought.
Multibuy list (4 items)
Step 1 · single reaction
Reaction jobs of step 1| Job | Runs | Per run | Duration | Produced | Used | Job cost |
|---|
Carbon-86 Epoxy Resin | 122 | 1h 22m 5s | 6d 22h 53m | 19,520 | 19,520 | 85.04M |
Buy for step 1
| Item | Quantity | Unit price | Total | Broker fee |
|---|
Nitrogen Fuel Block | 596 | 16.87K | 10.05M | 150.82K |
Fullerite-C32 | 11,908 | 20.81K | 247.81M | 3.72M |
Fullerite-C320 | 11,908 | 35.84K | 426.78M | 6.40M |
Zydrine | 3,573 | 1.00K | 3.58M | 53.65K |
| Total | | | 688.22M | 10.32M |
|---|
Job cost 85.04M = system
55.87M (9.58%) + facility tax
5.83M (1.00%) + SCC
23.33M (4.00%)
Step subtotal 783.58M
Summary
Costs
- Purchases
- 688.22M
- Broker fees
- 10.32M
- Job cost
- 85.04M
- Total cost
- 783.58M
Sale
- Output value
- 875.86M
- Sales tax & broker fees
- 44.67M
- Profit
- 47.61M
Slot time
- Jobs
- 1
- Total slot time
- 6d 22h 53m
- Profit / run (122 runs)
- 390.28K
- Profit / slot / day
- 6.85M
Outputs
| Item | Quantity | Unit price | Total | Tax & fees | Volume m³ |
|---|
Carbon-86 Epoxy Resin | 19,520 | 44.87K | 875.86M | 44.67M | 7,808.00 |
| Total | | | 875.86M | 44.67M | 7,808.00 |
|---|
Price timing
Default 7 days (chain depth × cycle length). Input prices as of 2026-10-21 19:10 UTC.
- Profit, inputs bought 7 days ago
- 48.16M
- Profit at today's prices
- 47.61M
- Difference
- +541.04K
Profit / slot / day Output value Input cost Traded per day, The Forge 10 of 30 days (≈ in the table) use the region's average daily trade price where
no hub prices were collected, for buying and selling alike.
Data table (30 days)
| Date | Profit / slot / day | Output value | Input cost | Traded |
|---|
| 2026-09-28 ≈ | -2.11M | 780.80M | 660.71M | 328,023 |
| 2026-09-29 ≈ | 4.18M | 780.80M | 617.58M | 165,641 |
| 2026-09-30 ≈ | 8.83M | 799.34M | 603.07M | 314,783 |
| 2026-10-01 ≈ | -197.12K | 797.59M | 663.30M | 476,307 |
| 2026-10-02 ≈ | 7.01M | 796.22M | 612.65M | 415,499 |
| 2026-10-03 ≈ | -2.95M | 766.75M | 653.35M | 238,077 |
| 2026-10-04 ≈ | -1.78M | 775.72M | 653.72M | 166,183 |
| 2026-10-05 ≈ | -152.76K | 773.58M | 640.54M | 432,214 |
| 2026-10-06 ≈ | 3.37M | 797.00M | 638.32M | 661,033 |
| 2026-10-07 ≈ | 3.44M | 801.69M | 642.22M | 222,324 |
| 2026-10-08 | 2.32M | 801.61M | 649.82M | 205,122 |
| 2026-10-09 | 4.75M | 802.01M | 633.52M | 94,991 |
| 2026-10-10 | 9.42M | 805.48M | 604.82M | 523,806 |
| 2026-10-11 | 7.37M | 801.33M | 614.95M | 152,825 |
| 2026-10-12 | 7.08M | 812.26M | 627.14M | 279,883 |
| 2026-10-13 | 4.60M | 811.58M | 643.49M | 387,176 |
| 2026-10-14 | 4.86M | 817.84M | 647.60M | 352,306 |
| 2026-10-15 | 4.97M | 811.46M | 640.85M | 289,575 |
| 2026-10-16 | 4.98M | 805.65M | 635.37M | 75,090 |
| 2026-10-17 | 3.72M | 807.33M | 645.60M | 206,114 |
| 2026-10-18 | 1.44M | 802.83M | 656.95M | 232,168 |
| 2026-10-19 | 1.63M | 815.68M | 667.72M | 768,089 |
| 2026-10-20 | 1.16M | 817.25M | 672.35M | 225,421 |
| 2026-10-21 | 169.58K | 819.15M | 680.94M | 277,866 |
| 2026-10-22 | -67.22K | 826.57M | 689.50M | 423,617 |
| 2026-10-23 | 2.99M | 856.49M | 696.55M | 146,861 |
| 2026-10-24 | 2.10M | 857.65M | 703.69M | 227,958 |
| 2026-10-25 | 1.76M | 858.40M | 706.75M | 246,065 |
| 2026-10-26 | 1.47M | 858.86M | 709.16M | 195,011 |
| 2026-10-27 | 3.91M | 853.42M | 687.35M | 664,472 |