- Profit / slot / day
- 2.93M
- Profit
- 20.38M
- Margin
- 7.8%
- ROI
- 8.9%
- Total cost
- 228.31M
- Output value
- 262.06M
- Runs
- 122
- Time per run
- 1h 22m 5s
- Job duration
- 6d 22h 53m
Material flow
Bought Final product Edge labels: quantity each job consumes. Production steps
One reaction job; every input is bought.
Multibuy list (4 items)
Step 1 · single reaction
Reaction jobs of step 1| Job | Runs | Per run | Duration | Produced | Used | Job cost |
|---|
Lanthanum Metallofullerene | 122 | 1h 22m 5s | 6d 22h 53m | 14,640 | 14,640 | 5.89M |
Buy for step 1
| Item | Quantity | Unit price | Total | Broker fee |
|---|
Oxygen Fuel Block | 596 | 17.81K | 10.61M | 159.22K |
Fullerite-C70 | 11,908 | 7.90K | 94.10M | 1.41M |
Fullerite-C84 | 11,908 | 8.40K | 100.07M | 1.50M |
Nocxium | 23,815 | 603 | 14.35M | 215.26K |
| Total | | | 219.14M | 3.29M |
|---|
Job cost 5.89M = system
3.87M (9.58%) + facility tax
403.77K (1.00%) + SCC
1.62M (4.00%)
Step subtotal 228.31M
Summary
Costs
- Purchases
- 219.14M
- Broker fees
- 3.29M
- Job cost
- 5.89M
- Total cost
- 228.31M
Sale
- Output value
- 262.06M
- Sales tax & broker fees
- 13.36M
- Profit
- 20.38M
Slot time
- Jobs
- 1
- Total slot time
- 6d 22h 53m
- Profit / run (122 runs)
- 167.05K
- Profit / slot / day
- 2.93M
Outputs
| Item | Quantity | Unit price | Total | Tax & fees | Volume m³ |
|---|
Lanthanum Metallofullerene | 14,640 | 17.90K | 262.06M | 13.36M | 14,640.00 |
| Total | | | 262.06M | 13.36M | 14,640.00 |
|---|
Price timing
Default 7 days (chain depth × cycle length). Input prices as of 2026-10-21 19:10 UTC.
- Profit, inputs bought 7 days ago
- 6.62M
- Profit at today's prices
- 20.38M
- Difference
- -13.76M
Profit / slot / day Output value Input cost Traded per day, The Forge 10 of 30 days (≈ in the table) use the region's average daily trade price where
no hub prices were collected, for buying and selling alike.
Data table (30 days)
| Date | Profit / slot / day | Output value | Input cost | Traded |
|---|
| 2026-09-28 ≈ | -221.69K | 238.78M | 218.97M | 126,403 |
| 2026-09-29 ≈ | 1.38M | 237.02M | 206.33M | 119,904 |
| 2026-09-30 ≈ | 1.18M | 237.31M | 207.99M | 192,817 |
| 2026-10-01 ≈ | 668.33K | 239.66M | 213.69M | 70,659 |
| 2026-10-02 ≈ | 715.45K | 239.36M | 213.10M | 242,584 |
| 2026-10-03 ≈ | 536.58K | 239.66M | 214.60M | 82,209 |
| 2026-10-04 ≈ | 2.20M | 255.61M | 218.10M | 93,745 |
| 2026-10-05 ≈ | 2.22M | 255.47M | 217.82M | 61,597 |
| 2026-10-06 ≈ | 2.67M | 255.76M | 215.07M | 392,706 |
| 2026-10-07 ≈ | 598.15K | 250.93M | 224.71M | 124,854 |
| 2026-10-08 | 6.17M | 289.87M | 222.96M | 120,829 |
| 2026-10-09 | 5.97M | 288.65M | 223.20M | 47,687 |
| 2026-10-10 | 5.45M | 283.23M | 221.69M | 244,099 |
| 2026-10-11 | 6.52M | 290.29M | 220.94M | 22,982 |
| 2026-10-12 | 5.84M | 286.42M | 221.99M | 167,257 |
| 2026-10-13 | 4.98M | 282.85M | 224.54M | 81,098 |
| 2026-10-14 | 4.59M | 284.32M | 228.58M | 202,935 |
| 2026-10-15 | 4.97M | 283.15M | 224.88M | 119,826 |
| 2026-10-16 | 4.97M | 283.06M | 224.78M | 14,780 |
| 2026-10-17 | 4.68M | 282.63M | 226.39M | 96,945 |
| 2026-10-18 | 4.47M | 282.60M | 227.78M | 150,802 |
| 2026-10-19 | 4.04M | 282.05M | 230.20M | 77,908 |
| 2026-10-20 | 3.37M | 279.46M | 232.42M | 184,652 |
| 2026-10-21 | 3.36M | 280.10M | 233.07M | 75,824 |
| 2026-10-22 | 2.96M | 278.31M | 234.15M | 159,086 |
| 2026-10-23 | 2.56M | 277.67M | 236.25M | 123,644 |
| 2026-10-24 | 2.32M | 276.92M | 237.25M | 107,382 |
| 2026-10-25 | 1.32M | 270.36M | 237.91M | 114,033 |
| 2026-10-26 | 1.35M | 265.07M | 232.76M | 144,024 |
| 2026-10-27 | 2.80M | 261.76M | 219.74M | 276,084 |