- Profit / slot / day
- 971.05K
- Profit
- 6.75M
- Margin
- 3.2%
- ROI
- 3.4%
- Total cost
- 196.65M
- Output value
- 214.33M
- Runs
- 122
- Time per run
- 1h 22m 5s
- Job duration
- 6d 22h 53m
Material flow
Bought Final product Edge labels: quantity each job consumes. Production steps
One reaction job; every input is bought.
Multibuy list (4 items)
Step 1 · single reaction
Reaction jobs of step 1| Job | Runs | Per run | Duration | Produced | Used | Job cost |
|---|
Methanofullerene | 122 | 1h 22m 5s | 6d 22h 53m | 19,520 | 19,520 | 10.88M |
Buy for step 1
| Item | Quantity | Unit price | Total | Broker fee |
|---|
Hydrogen Fuel Block | 596 | 17.04K | 10.16M | 152.34K |
Fullerite-C70 | 11,908 | 7.90K | 94.10M | 1.41M |
Fullerite-C72 | 11,908 | 6.10K | 72.66M | 1.09M |
Isogen | 35,722 | 171 | 6.11M | 91.63K |
| Total | | | 183.02M | 2.75M |
|---|
Job cost 10.88M = system
7.14M (9.56%) + facility tax
747.03K (1.00%) + SCC
2.99M (4.00%)
Step subtotal 196.65M
Summary
Costs
- Purchases
- 183.02M
- Broker fees
- 2.75M
- Job cost
- 10.88M
- Total cost
- 196.65M
Sale
- Output value
- 214.33M
- Sales tax & broker fees
- 10.93M
- Profit
- 6.75M
Slot time
- Jobs
- 1
- Total slot time
- 6d 22h 53m
- Profit / run (122 runs)
- 55.35K
- Profit / slot / day
- 971.05K
Outputs
| Item | Quantity | Unit price | Total | Tax & fees | Volume m³ |
|---|
Methanofullerene | 19,520 | 10.98K | 214.33M | 10.93M | 14,640.00 |
| Total | | | 214.33M | 10.93M | 14,640.00 |
|---|
Price timing
Default 7 days (chain depth × cycle length). Input prices as of 2026-10-21 21:40 UTC.
- Profit, inputs bought 7 days ago
- -1.64M
- Profit at today's prices
- 6.75M
- Difference
- -8.39M
Profit / slot / day Output value Input cost Traded per day, The Forge 10 of 30 days (≈ in the table) use the region's average daily trade price where
no hub prices were collected, for buying and selling alike.
Data table (30 days)
| Date | Profit / slot / day | Output value | Input cost | Traded |
|---|
| 2026-09-28 ≈ | 2.03M | 225.07M | 185.82M | 107,208 |
| 2026-09-29 ≈ | 3.63M | 224.48M | 174.33M | 86,466 |
| 2026-09-30 ≈ | 3.92M | 227.60M | 175.23M | 227,625 |
| 2026-10-01 ≈ | 495.91K | 204.37M | 176.97M | 179,624 |
| 2026-10-02 ≈ | 2.75M | 222.72M | 178.71M | 200,926 |
| 2026-10-03 ≈ | 1.26M | 213.35M | 180.10M | 121,663 |
| 2026-10-04 ≈ | 1.78M | 218.62M | 181.50M | 107,911 |
| 2026-10-05 ≈ | 2.59M | 220.38M | 177.57M | 52,012 |
| 2026-10-06 ≈ | 2.87M | 222.72M | 177.89M | 401,747 |
| 2026-10-07 ≈ | 8.23M | 267.62M | 183.14M | 88,685 |
| 2026-10-08 | 8.41M | 267.87M | 182.15M | 117,339 |
| 2026-10-09 | 8.26M | 266.98M | 182.28M | 52,251 |
| 2026-10-10 | 7.85M | 262.84M | 181.23M | 260,709 |
| 2026-10-11 | 8.25M | 266.37M | 181.82M | 69,856 |
| 2026-10-12 | 7.02M | 259.07M | 183.38M | 207,892 |
| 2026-10-13 | 5.74M | 252.55M | 186.09M | 201,228 |
| 2026-10-14 | 4.82M | 248.96M | 189.01M | 290,012 |
| 2026-10-15 | 5.23M | 247.94M | 185.25M | 147,100 |
| 2026-10-16 | 5.01M | 245.98M | 184.98M | 164,121 |
| 2026-10-17 | 4.57M | 243.85M | 185.96M | 161,131 |
| 2026-10-18 | 4.23M | 243.34M | 187.80M | 138,809 |
| 2026-10-19 | 4.04M | 243.90M | 189.63M | 138,993 |
| 2026-10-20 | 1.41M | 226.09M | 191.01M | 140,474 |
| 2026-10-21 | 1.48M | 227.42M | 191.80M | 184,852 |
| 2026-10-22 | 898.29K | 224.59M | 193.12M | 175,501 |
| 2026-10-23 | 776.69K | 225.58M | 194.87M | 70,633 |
| 2026-10-24 | 187.20K | 224.35M | 197.77M | 171,760 |
| 2026-10-25 | -503.45K | 221.15M | 199.50M | 116,502 |
| 2026-10-26 | -573.28K | 217.78M | 196.83M | 168,593 |
| 2026-10-27 | 336.46K | 214.03M | 187.10M | 334,251 |